Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
We reserve the right to make any changes due to technical modifications.
Boiler inspection and maintenance
16
15.
Secure gas manifold with wire or cord.
16.
GC124 II only: Remove igniter cable from ignition
module (
Î
Fig. 45).
17.
Disconnect cable connector from bottom of gas
valve (
Î
Fig. 45).
18.
Label cables to the flame roll-out switch, then
remove cable. (
Î
Fig. 45).
Fig. 45
Front view (GC124 II top, GC124 SP bottom)
1
Flame roll-out switch
2
Flame roll-out switch cable
3
Gas valve
4
Gas supply pipe
5
Aquastat
6
Ignition module (GC124 II only)
7
Igniter cable (GC124 II only)
8
Gas valve cable connector
9
Pilot line
10
Igniter cable (GC124 II only) or Thermocouple cable
(GC124 SP only)