Boiler inspection and maintenance
16
49
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
19.
Remove four (4) screws from gas manifold on top of
gas valve.
20.
Remove two (2) screw nuts on burner tray and take
out the tray.
21.
Remove 4 screws on sides of the top cover and lift
off.
Fig. 46
Removing burner (GC124 SP shown)
1
Screw nuts (two)
2
Screws on gas manifold on top of gas valve (four)
2
1
Fig. 47
Remove top cover