Boiler Maintenance
10
Logano G125 BE - Specifications subject to change without notice.
54
Maintenance Procedure
Page Date: ______
Date: ______
Date: ______
1.
Take the boiler out of operation
47
2.
Remove flue baffles from passages and clean flue fire baffles
49
3.
Clean flue passages and the combustion chamber,
Insert the flue baffles into the boiler in their original position
49
4.
Check burner door sealing rope. Replace damaged or hardened
sealing rope. Close burner door by tightening the burner door bolts.
49
5.
Take the boiler in operatio
39
6.
Final check at the system after maintenance and service inspection
7.
Check boiler in operation
Confirm service and maintenance work
Sign/Date
Sign/Date
Sign/Date