Boiler Installation
7
Logano G125 BE - Specifications subject to change without notice.
38
7.6.4 Electrical Connections
Install a power supply point near the boiler in accor-
dance with local and state code.
z
Route all electrical wiring through the top cover race
way and install wiring per electrical schematics in
Logamatic manuals (
Î
Chapter 14, page 67).
7.6.5 Strain Relief Installation
Secure all electrical wiring near the Logamatic using the
furnished plastic cable ties.
z
Install cable clips with the tab facing up into the rear
of the Logamatic (step 1).
z
Slide cable clips down and lock them in (step 2).
z
Push cable clips in (step 3).
z
Push hinging tab down to secure cable (step 4).
7.6.6 Top Rear Panel Installation
z
Put control top cover back and secure.
z
Install rear top panel on boiler.
WARNUNG!
DANGER OF FIRE
Electrical wiring can be damaged by hot
boiler parts.
z
Make sure that all tubing and wiring
components are all placed on top of the
boiler insulation.
z
Ensure that the unit is properly ground-
ed.
Fig. 35
Secure wiring with cable clips
Fig. 36
Installation of rear top cover
1
Control top cover
2
Rear top panel
2
1