Boiler Maintenance
10
Logano G125 BE - Specifications subject to change without notice.
52
10.6 Inspection and Maintenance Procedure
z
Sign off and date performed service work.
This service and maintenance protocol can also be
copied for further use.
Service Work
Page Date: ______
Date: ______
Date: ______
1.
Check general status of system
2.
Do visual performance test on system
3.
Check fuel and water components for:
Leaks during operation
Hydrostatic water test
Visual corrosion
Exterior system changes
4.
Check flue passages for soot, shut off system
48
5.
Check burner operation (
Î
See burner manual)
6.
Check combustion air inlets and vent system
7.
Check system pressure, relief valve and expansion tank
51
8.
Check DHW tank anode status (
Î
See DHW tank manual)
9.
Check control settings (
Î
See manual)
10. Final check, record combustion test results
Confirm service work
Sign/Date
Sign/Date
Sign/Date