Boiler Installation
7
Logano G125 BE - Specifications subject to change without notice.
36
7.6.2 Control System Installation
z
To remove rear top cover first unscrew two rear sheet
metal screws.
z
Carefully route the burner cable on the outside of the
insulation from the front of the boiler to the controls
location at the top of the boiler.
z
Slide plastic front tabs of control panel into the oval
shaped openings.
z
Slide the control panel forward.
z
Push forward on plastic snap tabs in rear of control to
engage them into the top panes square knock-outs.
z
Remove top cover of control panel. Remove cover
screws.
z
Secure control to top cover using small sheet metal
screws.
Fig. 29
Removal of rear top cover and top cover plate
Fig. 30
Installation of control
1
Plastic snap tabs
2
Plastic font tabs
3
Oval knock-outs
4
Square knock-outs
1
3
4
2
Fig. 31
Removal of top cover
1
Top cover screws
2
Sheet metal screws
1
2