Büchi Labortechnik AG
Installation | 5
Operation Manual Lyovapor™ L-300/L-300 Pro
33/118
5.2.9
Connecting inert gas (option)
3
2
1
6
5
4
Fig. 19: Connecting inert gas
1
Inert gas tube
2
Tube clip
3
Gas connection for pressure regulat-
ing valve
4
Gas connection for venting valve
5
Tube clip
6
Inert gas tube
Connecting the inert gas to the pressure regulating valve
Precondition:
R
The gas connection complies with the specified parameters. See Chapter 3.6
"Technical data", page 21
u
Switch the On/Off master switch to Off.
u
Fit the inert gas tube (1) onto the gas connection for the pressure regulating
valve (3).
u
Fix the inert gas tube (1) with the tube clip (2).
Connecting the inert gas to the venting valve
Precondition:
R
The gas connection complies with the specified parameters. See Chapter 3.6
"Technical data", page 21
u
Switch the On/Off master switch to Off.
u
Fit the inert gas tube (6) onto the gas connection for the venting valve (4).
u
Fix the inert gas tube (6) with the tube clip (5).