Büchi Labortechnik AG
Installation | 5
Operation Manual Lyovapor™ L-300/L-300 Pro
31/118
u
Plug the receiving vessel sensor electrical connection into the socket marked
Waste Water.
5.2.7
Connecting the coolant
3
4
2
1
Fig. 17: Connecting the coolant
1
Coolant inlet connection
2
Coolant outlet connection
3
Drain tube
4
Inlet tube
Precondition:
R
The coolant connection complies with the specified parameters. See Chapter 3.6
"Technical data", page 21
u
Make sure that the instrument is not connected to the power supply.
u
Fit the inlet tube (4) onto the coolant inlet connection (1).
u
Fix the inlet tube (4) in place with a hose clip.
u
Fit the drain tube (3) onto the coolant drain connection (2).
u
Fix the drain tube (3) in place with a hose clip.
5.2.8
Fitting pressure sensors (option)
The pressure sensors measure the pressure in the top-mount drying rack.