Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-300/L-300 Pro
89/118
u
Locate the cylinder in the groove above the
main plate.
u
Fit manifold valve onto the connection on the
top-mount drying rack.
u
Check the O-ring for damage.
u
Place the O-ring into the groove of the cover.
u
Place the manifold cover on the cylinder.
u
Carry out freeze-drying.