8 | Operating top-mount drying racks
Büchi Labortechnik AG
90/118
Operation Manual Lyovapor™ L-300/L-300 Pro
8.4
Operating acrylic drying chamber (heatable shelf)
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the O-ring for damage.
u
Place the O-ring into the groove on the ice
condenser.
u
Place the main plate on the ice condenser.
u
Make sure that the groove on the ice condenser
is clean, free of dust and not scratched.
u
Check the 300 mm dia. O-ring for damage.
u
Place the 300mm dia. O-ring in the groove in
the main plate.
u
Place the intermediate plate on the main plate.
u
Loosen all fixing screws.