Büchi Labortechnik AG
Installation | 5
Operation Manual Lyovapor™ L-300/L-300 Pro
29/118
R
Depending on the volume of the sample and the environmental conditions 3 L to
8.5 L water in 24 h is necessary.
u
Switch the On/Off master switch to Off.
u
Fit the inlet tube (4) onto the connection marked Fresh Water (5).
u
Fit the fresh water level sensor (optional). See Chapter 5.2.4 "Fitting fill-level
sensor in water tank (optional)", page 29
5.2.4
Fitting fill-level sensor in water tank (optional)
Fig. 14: Fitting the fresh water level sensor
u
Switch the On/Off master switch to Off.
u
Fit the sensor on the fresh water container above the inlet tube.
u
Plug the fresh water sensor electrical connection into the socket marked Defrost
Water.
5.2.5
Fitting the drain tubes
CAUTION
Risk of scalding by hot water
u
Make sure the condensate drain hose is not loose.
NOTE
u
Use only the containers supplied.
u
Place container at the same level as the instrument.