9 | Cleaning and servicing
Büchi Labortechnik AG
100/118
Operation Manual Lyovapor™ L-300/L-300 Pro
Ice condenser 1
1
1
1
24.4L
47.2L
Acrylic drying chamber
(with 4 drying shelves)
54.1L
Acrylic drying chamber
(with 6 drying shelves)
Ice condenser 2
2
2
2
24.4L
47.2L
Acrylic drying chamber
(with 4 drying shelves)
54.1L
Acrylic drying chamber
(with 6 drying shelves)
Both ice condensers
1
2
1
2
1
2
33.5L
56.3L
Acrylic drying chamber
(with 4 drying shelves)
63.2L
Acrylic drying chamber
(with 6 drying shelves)
u
Tap the function
[Start]
on the function bar.
ð
The leak test starts.
ð
The status bar shows the status Leak Test.
ð
When the leak test is completed, the
[Leak test]
tab indicates whether the leak
test was successful.