AC Level 2 Charger
INSTALLATION AND USER’S MANUAL
Page
33
of
59
This document is a
Property of BTCPower Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
09-Mar-20
Revision
T
Dual
Port Charger
(30A/40A)
–
Pedestal
Connect L1 and L2 on both charge ports to the input safety breaker. BTCPower highly
recommends crimp ferrule lugs to be used to make all electrical connection to the input safety
breaker. This requires the correct crimping tool. In addition, a torque wrench should be used
on the input breaker screw terminals. Set the wrench to a torque of 2.4Nm or 21.2 lb.in. A pull
test should be done on the wire connections to ensure proper connection.
Eaton Breaker (FAZ-C50/2)
Charger
Wire Size
Torque Requirement
30A
10
–
8AWG (recommended)
21.2 lb.in
(2.4 N.m)
40A
8
–
6AWG (recommended)
* Temperature rating of wires should be 60°C. Use Copper wires only.
NOTE
Appropriate wire size / gauge to be used will be determined by the installer in-charge.
INSTALLATION