Conduit Connection Options:
The conduit carrying electrical service can also be installed above the concrete slab
going thru:
a)
a hole drilled on either left or right side of the charger unit going thru the same side of
the pedestal base going up to the input safety breaker,
b)
a hole drilled on the rear side of the charger unit going thru the same side of the
pedestal base going up to the input safety breaker
In either option above, please ensure that the cut surfaces (during drilling) are treated /
recoated in order to prevent from rusting.