Brooks Automation
P/N: PFD0-DI-00010, Rev 5.0.0, April 9, 2022
Service Procedures
Copyright © 2022, Brooks Automation, Inc.
107
and allow the front cover to be removed. It is not necessary to remove the tape seal
tension brackets from the top of the Z carriage.
5.
Replace the Z stage one belt. When hooking the belt around the Z motor pulley,
make sure the belt is inside the flanges on the Z motor pulley.
6.
Adjust belt tension per above, replace parts.
7.
Recalibrate robot.
Replacing the Z column Stage Two Timing Belt
DANGER:
Before replacing the power supplies, the AC power should be
removed.
Tools Required:
1.
2.0mm hex driver
2.
3.0mm hex L wrench
3.
3.0mm hex driver
4.
4.0mm ball end hex driver
Spare Parts Required:
1.
J2 Stage One Belt, PN PFD0-MC-X0003 (500mm, 1000mm, 1420mm stroke).
The user must:
1.
Move the Z carriage to 640mm height for the 1000mm and 1420mm Z travel robots,
or 380mm height for the 500mm Z travel robot.
2.
Turn off the robot power and remove the AC power cord.
3.
Remove the curved rear cover from the Z column.