Maintenance...
Regular maintenance of the edger
5-143
Flow chart 5-6: Complete cleaning of the settling tank
5.7.6.3 H
INTS
>
If the pump is not activated when you restart the machine after cleaning, open the discharge valve to the
minimum to allow the escape of any air which has remained in the pipes. Close the valve before restarting
the process.
>
Always check the water-tightness of the unit before restarting the machine.
• Check the connections of the drain, water supply and pump pipes.
• Ensure that the discharge valve is closed.
• If you have worked on the solenoid valves, check the fixings.
#9 Remove the settler carefully.
#10 Clean the settler with a plastic spatula and a brush above the drainage
system (bucket, waste bin, drain, etc.).
#11 Clean the settler.
#12 Remove the used plastic bag from the settling tank and dispose of it.
#13 Clean the settling tank if necessary.
#14 Place a new plastic bag in the settling tank.
#15 Reassemble the tanks, pump and pipes.
#16 Fill the water tank to within 6 or 7 cm of the upper edge of the plastic bag.
#17 Run a dummy edging cycle to prime the unit.
Содержание emotion
Страница 1: ...Operation manual...
Страница 3: ......
Страница 9: ...Table of contents...
Страница 10: ...REVISION FOLLOW UP Revision 01 Page New Modified Item New document...
Страница 11: ...3 10...
Страница 12: ...1 INSTALLATION...
Страница 13: ...1 12 UNPACKING THE MACHINE 1 2 3 4 5 8 9 Keep the case the small carton and the hose near the machine 6 7...
Страница 15: ...Installation Unpacking the machine 1 14...
Страница 17: ...Installation Removing the shipping rails 1 16...
Страница 23: ...Installation Water connections 1 22...
Страница 25: ...Installation Electrical connections 1 24 1 3 2...
Страница 28: ...2 SAFETY PRECAUTIONS...
Страница 29: ...2 28...
Страница 31: ...Safety precautions Safety 2 30...
Страница 33: ...2 32 Safety precautions Recommendations...
Страница 34: ...3 USING YOUR EDGER...
Страница 35: ...3 34...
Страница 41: ...3 40...
Страница 45: ...Using your Edger General principles of use 3 44 Pin 1 2 3 5 Blocker head Blocker arm 4...
Страница 47: ...Using your Edger General principles of use 3 46 3 2 4 USUAL PROCEDURE EDGING Enter the Edging tab...
Страница 51: ...Using your Edger General principles of use 3 50...
Страница 75: ...Using your Edger Special cases 3 74...
Страница 87: ...Using your Edger Special cases 3 86...
Страница 94: ...4 CONFIGURATION...
Страница 95: ...4 94...
Страница 102: ...Configuration Configuration of finishing parameters default values 4 101...
Страница 107: ...Configuration Correction of frame and lens values 4 106...
Страница 112: ...5 MAINTENANCE...
Страница 113: ...5 112...
Страница 117: ...Maintenance Visualising the components 5 116...
Страница 119: ...Maintenance Task list 5 118...
Страница 121: ...Maintenance Maintenance of the touch screen unit 5 120 Illustration 5 1 Scanform...
Страница 124: ...Maintenance Maintenance of the Scanform unit 5 123...
Страница 125: ...Maintenance Maintenance of the Scanform unit 5 124 Illustration 5 1 Centering blocking system...
Страница 131: ...Maintenance Regular maintenance of the edger 5 130...
Страница 135: ...Maintenance Regular maintenance of the edger 5 134...
Страница 147: ...Maintenance Regular maintenance of the edger 5 146...
Страница 149: ...Maintenance Handling the covers 5 148...
Страница 151: ...Maintenance Preventive maintenance 5 150...
Страница 156: ...Maintenance Adjustments 5 155...
Страница 157: ...Maintenance Adjustments 5 156 Screen 5 4 Feeling adjustment...
Страница 159: ...Maintenance Adjustments 5 158 Screen 5 5 Adjusting the sizes Screen 1...
Страница 163: ...Maintenance Adjustments 5 162 Screen 5 6 Adjustment of the flush of the mill bit...
Страница 165: ...Maintenance Adjustments 5 164 Screen 5 7 Adjustment of the touch screen...
Страница 167: ...Maintenance Adjustments 5 166 Screen 5 8 Example of a setting values display screen...
Страница 169: ...Maintenance Adjustments 5 168...
Страница 173: ...Maintenance Consulting the statistics 5 172...
Страница 196: ...6 TESTS...
Страница 197: ...6 196...
Страница 203: ...Tests Operating principle 6 202...
Страница 204: ...7 TECHNICAL SPECIFICATIONS...
Страница 205: ...7 212...
Страница 209: ...Technical specifications Technical specifications 7 216...
Страница 210: ...2 rue Roger Bonnet 27340 PONT DE L ARCHE FRANCE Tel 33 02 32 98 91 32 Fax 33 02 35 02 02 94...