Operation
BOMAG
68
BW 100/120/125 AD-4/AC-4
Caution
!
Always empty the chip spreader
1
before trans-
port.
l
Engage the articulation lock.
l
Fold down the foldable ROPS
2
Fig. 112
l
Use the four lifting eyes (Fig. 112) on the sup-
port legs to lift the machine.
Loading with a lifting belt
3
Danger
!
Danger of accident! Life hazard!
With the chip spreader attached the machine
must not be lifted with lifting belts, because of
the changed centre of gravity.
Engage the articulation lock.
Check all lifting tackle for damage before lift-
ing the machine. Do not use damaged or in any
other way impaired lifting tackle.
Lifting tackle must only be attached to loads
by expert personnel (qualified person).
Do not overload the lifting belt.
Use only safe lifting gear of sufficient load
bearing capacity Minimum lifting capacity of
lifting gear: see operating weight in chapter
"Technical Data".
Do not lift or lower the machine jerkily.
The tension must always be effective in verti-
cal direction.
The machine must not swing about when be-
ing lifted.
Do not step or stand under suspended loads.
After lifting hook the lifting belt back into its re-
ceptacle.
Have the lifting tackle inspected by an expert
(properly trained person) once every year.
After 5 years replace the lifting belt with a new
one.
l
Engage the articulation lock.
l
Fold down the foldable ROPS
4
l
Fold the vandalism protection down to protect
the dashboard.
Fig. 113
l
To lift the machine pull out the lifting eye from
the bracket and hook it into the lifting gear (Fig.
113).
1
Optional equipment
2
Optional equipment
3
Optional equipment
4
Optional equipment
Содержание BW 100 AC-4
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 BW 100 120 125 AD 4 AC 4...
Страница 9: ...BOMAG 9 BW 100 120 125 AD 4 AC 4 2 Technical Data...
Страница 14: ...Technical Data BOMAG 14 BW 100 120 125 AD 4 AC 4 1 Subject to technical alterations...
Страница 16: ...Technical Data BOMAG 16 BW 100 120 125 AD 4 AC 4...
Страница 17: ...BOMAG 17 BW 100 120 125 AD 4 AC 4 3 Safety regulations...
Страница 30: ...Safety regulations BOMAG 30 BW 100 120 125 AD 4 AC 4...
Страница 31: ...BOMAG 31 BW 100 120 125 AD 4 AC 4 4 Indicators and Controls...
Страница 32: ...Indicators and Controls BOMAG 32 BW 100 120 125 AD 4 AC 4 Fig 20...
Страница 44: ...Indicators and Controls BOMAG 44 BW 100 120 125 AD 4 AC 4...
Страница 45: ...BOMAG 45 BW 100 120 125 AD 4 AC 4 5 Operation...
Страница 71: ...BOMAG 71 BW 100 120 125 AD 4 AC 4 6 Maintenance...
Страница 80: ...Maintenance BOMAG 80 BW 100 120 125 AD 4 AC 4...
Страница 88: ...Every 50 operating hours BOMAG 88 BW 100 120 125 AD 4 AC 4...
Страница 98: ...Every 250 operating hours BOMAG 98 BW 100 120 125 AD 4 AC 4...
Страница 102: ...Every 500 operating hours BOMAG 102 BW 100 120 125 AD 4 AC 4...
Страница 110: ...Every 2000 operating hours BOMAG 110 BW 100 120 125 AD 4 AC 4...
Страница 112: ...Every 3000 operating hours BOMAG 112 BW 100 120 125 AD 4 AC 4...
Страница 118: ...As required BOMAG 118 BW 100 120 125 AD 4 AC 4...
Страница 119: ...BOMAG 119 BW 100 120 125 AD 4 AC 4 7 Trouble shooting...
Страница 123: ...BOMAG 123 BW 100 120 125 AD 4 AC 4 8 Disposal...
Страница 125: ......
Страница 126: ...Powered by TCPDF www tcpdf org...