Operation
BOMAG
60
BW 100/120/125 AD-4/AC-4
5.15 Mounting/removing the chip
spreader
1
Danger
!
Danger of accident!
When mounting or removing the chip spreader
do not step between the chip spreader and the
machine while the engine is running.
Park the machine on a level and solid base to
mount or remove the chip spreader and shut
down the engine.
Mount and remove the chip spreader when it is
empty.
Mounting the chip spreader
Fig. 88
l
Lift the chip spreader by the lifting points (Fig.
88) and hook it carefully into the fixing points
on the machine.
Fig. 89
l
Insert the bolt (Fig. 89) and secure it with the
cotter pin.
Fig. 90
l
Connect the chip spreader hydraulically and
electrically with the machine (Fig. 90).
Disassembling the chip spreader
l
Empty the chip spreader, see section "Filling/
emptying the chip spreader".
Danger
!
Danger of accident!
Always stand the chip spreader on level and
firm ground.
1
Optional equipment
Содержание BW 100 AC-4
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 BW 100 120 125 AD 4 AC 4...
Страница 9: ...BOMAG 9 BW 100 120 125 AD 4 AC 4 2 Technical Data...
Страница 14: ...Technical Data BOMAG 14 BW 100 120 125 AD 4 AC 4 1 Subject to technical alterations...
Страница 16: ...Technical Data BOMAG 16 BW 100 120 125 AD 4 AC 4...
Страница 17: ...BOMAG 17 BW 100 120 125 AD 4 AC 4 3 Safety regulations...
Страница 30: ...Safety regulations BOMAG 30 BW 100 120 125 AD 4 AC 4...
Страница 31: ...BOMAG 31 BW 100 120 125 AD 4 AC 4 4 Indicators and Controls...
Страница 32: ...Indicators and Controls BOMAG 32 BW 100 120 125 AD 4 AC 4 Fig 20...
Страница 44: ...Indicators and Controls BOMAG 44 BW 100 120 125 AD 4 AC 4...
Страница 45: ...BOMAG 45 BW 100 120 125 AD 4 AC 4 5 Operation...
Страница 71: ...BOMAG 71 BW 100 120 125 AD 4 AC 4 6 Maintenance...
Страница 80: ...Maintenance BOMAG 80 BW 100 120 125 AD 4 AC 4...
Страница 88: ...Every 50 operating hours BOMAG 88 BW 100 120 125 AD 4 AC 4...
Страница 98: ...Every 250 operating hours BOMAG 98 BW 100 120 125 AD 4 AC 4...
Страница 102: ...Every 500 operating hours BOMAG 102 BW 100 120 125 AD 4 AC 4...
Страница 110: ...Every 2000 operating hours BOMAG 110 BW 100 120 125 AD 4 AC 4...
Страница 112: ...Every 3000 operating hours BOMAG 112 BW 100 120 125 AD 4 AC 4...
Страница 118: ...As required BOMAG 118 BW 100 120 125 AD 4 AC 4...
Страница 119: ...BOMAG 119 BW 100 120 125 AD 4 AC 4 7 Trouble shooting...
Страница 123: ...BOMAG 123 BW 100 120 125 AD 4 AC 4 8 Disposal...
Страница 125: ......
Страница 126: ...Powered by TCPDF www tcpdf org...