Operation
BOMAG
54
BW 100/120/125 AD-4/AC-4
Fig. 70
l
Set the throttle lever (Fig. 70) to position "MIN"
(idle speed).
Caution
!
Do not shut down the engine all of a sudden
from full load speed, but let it idle for about 2
minutes.
Fig. 71
l
Turn the start switch (Fig. 71) to position "0"
and pull out the ignition key.
Danger
!
Danger of accident!
Secure the machine against unauthorized use,
pull the ignition key out.
Mark machines, which could be in the way,
with a clearly visible sign.
5.10 Switching the vibration on
and off
Danger
!
Risk of damage!
When compacting with vibration you must
check the effect of nearby buildings and un-
derground supply lines (gas, water, sewage,
electric power), if necessary stop compaction
with vibration.
Caution
!
Danger of bearing damage!
Do not activate the vibration on hard (frozen,
concrete) ground.
Caution
!
Switch on vibration only with the throttle lever
in full load position "MAX I" or "MAX II".
Vibration at standstill causes transverse ruts,
therefore:
l
switch the vibration on only after shifting the
travel lever to the desired travel direction.
l
Switch the vibration off before stopping the
machine.
Содержание BW 100 AC-4
Страница 2: ......
Страница 8: ...Table of Contents BOMAG 8 BW 100 120 125 AD 4 AC 4...
Страница 9: ...BOMAG 9 BW 100 120 125 AD 4 AC 4 2 Technical Data...
Страница 14: ...Technical Data BOMAG 14 BW 100 120 125 AD 4 AC 4 1 Subject to technical alterations...
Страница 16: ...Technical Data BOMAG 16 BW 100 120 125 AD 4 AC 4...
Страница 17: ...BOMAG 17 BW 100 120 125 AD 4 AC 4 3 Safety regulations...
Страница 30: ...Safety regulations BOMAG 30 BW 100 120 125 AD 4 AC 4...
Страница 31: ...BOMAG 31 BW 100 120 125 AD 4 AC 4 4 Indicators and Controls...
Страница 32: ...Indicators and Controls BOMAG 32 BW 100 120 125 AD 4 AC 4 Fig 20...
Страница 44: ...Indicators and Controls BOMAG 44 BW 100 120 125 AD 4 AC 4...
Страница 45: ...BOMAG 45 BW 100 120 125 AD 4 AC 4 5 Operation...
Страница 71: ...BOMAG 71 BW 100 120 125 AD 4 AC 4 6 Maintenance...
Страница 80: ...Maintenance BOMAG 80 BW 100 120 125 AD 4 AC 4...
Страница 88: ...Every 50 operating hours BOMAG 88 BW 100 120 125 AD 4 AC 4...
Страница 98: ...Every 250 operating hours BOMAG 98 BW 100 120 125 AD 4 AC 4...
Страница 102: ...Every 500 operating hours BOMAG 102 BW 100 120 125 AD 4 AC 4...
Страница 110: ...Every 2000 operating hours BOMAG 110 BW 100 120 125 AD 4 AC 4...
Страница 112: ...Every 3000 operating hours BOMAG 112 BW 100 120 125 AD 4 AC 4...
Страница 118: ...As required BOMAG 118 BW 100 120 125 AD 4 AC 4...
Страница 119: ...BOMAG 119 BW 100 120 125 AD 4 AC 4 7 Trouble shooting...
Страница 123: ...BOMAG 123 BW 100 120 125 AD 4 AC 4 8 Disposal...
Страница 125: ......
Страница 126: ...Powered by TCPDF www tcpdf org...