83
SUSPENSION CLEARANCE
The allowable side-to-side movement between spring leaf and shackle or between shackle and spring
hanger is 1/4". The allowable movement between spring torque leaf bushing tube and the spring hanger is 1/
4". Total movement may be determined by inserting a 12" to 16" bar through the spring hanger bracket and
the torque leaf at the spring eye, shifting the torque leaf side to side and up and down. DO NOT use a bar
over 16" long to prevent damage to spring hanger or spring.
FRONT SPRING
HANGER BRACKET
SHACKLE
SPRING
.030 MIN.
.125
+/-.125
FRONT
REAR SUSPENSION
FRONT SPRING
HANGER BRACKET
.125
+/-.125
REAR SPRING
REAR
SCHEDULED MAINTENANCE
MONTHLY OR 1,000 MILES
•
Grease safety barrier latch on Braun wheelchair lift.
•
Lubricate roof hatch weatherseals & lock mechanisms.
•
Inspect all emergency equipment mounting fasteners.
•
Lubricate window latches and slides.
•
Lubricate hinge pin on entrance doors.
•
Lubricate pivot points on outward opening door.
•
Check/adjust roller bracket and control rod bracket on jackknife door.
•
Check/adjust air pressure in power jackknife door.
•
Inspect outer fasteners and lubricate electric stop arms.
•
Inspect seat frames for secure attachment to the floor and wall.
MONTHLY OR 3,000 MILES
•
Check fuel system (Drain fuel and contaminants, if required).
•
Check battery water level.
•
Inspect brake chambers.
Содержание TC/2000
Страница 1: ...Owner s Manual TC 2000 ...
Страница 3: ...2 ...
Страница 106: ...105 NOTES ...
Страница 111: ...Part Number 1919331 Blue Bird Corporation P O Box 937 Fort Valley GA 31030 ...