Drive Train
Highway Class Paver/Finishers
A-93
INSTALLATION – DRIVE ON
(FIELD REPLACEMENT)
Step 1:
Drive on to new track.
a. Lay the new track (1) out on the ground directly
in line with and in front of the old track (2).
1
2
BK-51
b. Move forward over the new track until the rear
end is directly under the drive sprocket (3).
3
0718-59
Step 2:
Feed track over bogie wheels.
!
WARNING
!
When feeding track over sprocket, do not get
clothing or hands caught between track and
sprocket.
a. Hold the track up to the drive sprocket and move
forward feeding the track up over the sprocket.
b. Continue forward slowly feeding the track over
the bogie wheels.
0718-60
Step 3:
Pull slack out of track and join the ends beneath the
front take-up wheel.
BK-52
Step 4:
Install track.
a. Move the joint to the rear on the ground again in
front of the drive sprocket.
b. Place band over shoe bolts.
c. Install guide plates.
d. Install nuts onto pad studs and start threads.
!
CAUTION
Locknuts should not be tightened in excess of
35 lb-ft (47 N•m) at this time. It is important that
the track band be compressed evenly and that
the guides and shoes contact each other.
e. Tighten the nuts against the guides using the
tightening sequence illustrated for "setting" nuts.
Tighten to 35 lb-ft (47 N•m) at this time.
Содержание PF-200
Страница 77: ...Drive Train Highway Class Paver Finishers A 77 BK 47 2 1 ...
Страница 117: ...Highway Class Paver Finishers Drive Train ...