Highway Class Paver/Finishers
Drive Train
A-102
BK-39
1
Step 2:
Check track operation.
a. Drive the machine in reverse for one full track
revolution.
b. Drive machine in forward for two full track
revolutions.
c. Verify proper track tension by sight.
EQUIPMENT PREPARATION
Step 1:
Check all guides for proper torque specification.
Step 2:
Check hydraulic fluid level. Fill if necessary.
Step 3:
Lubricate all fittings with proper grease.
IMPORTANT
Repeating the torque sequence is absolutely
necessary to achieve final torque specification.
e. Repeat the torque sequence on each guide
twice, before proceeding to the next guide.
Step 4:
Tighten track tension cylinder bleeder screw (1) if
loosened.
1
0718-40A
TRACK TENSION ADJUSTMENT
Step 1:
Adjust take-up wheel position.
a. Start engine.
b. Loosen track tension cylinder bleeder screw (1).
c. Engage manual clutch to bleed cylinder of air
until a solid stream of hydraulic fluid without air
bubbles is seen.
d. Tighten bleeder screw; track tension will adjust.
Содержание PF-200
Страница 77: ...Drive Train Highway Class Paver Finishers A 77 BK 47 2 1 ...
Страница 117: ...Highway Class Paver Finishers Drive Train ...