
Drive Train
Highway Class Paver/Finishers
A-53
DISASSEMBLY
Step 1:
Drain traction transmission fluid. Transmission
contains 10.5 pts., (5 liters) of fluid.
a. Loosen transmission drain plug.
b. Allow transmission fluid to drain into catch
container.
Step 2:
Remove shift cap assembly (1) if necessary.
a. Match mark shift cap for proper orientation.
b. Remove bolts that attach shift cap to transmis-
sion.
c. Remove shift cap.
BK-171A
1
Step 3:
If further disassembly is needed, refer to Appendix
A-1 for a listing of available publications.
INSPECTION
Step 1:
Inspect drive shaft universal joints for wear
(looseness) or damage.
Step 2:
Inspect drive motor for leakage or damage. Replace
shaft seal if there is leakage.
Step 3:
Inspect shift cap assembly for leakage or damage.
a. Remove capscrews if there is leakage.
b. Replace quad seals in the piston assembly.
Step 4:
Inspect three speed transmission for leakage or
damage.
ASSEMBLY
Step 1:
If further disassembly was required, refer to vendor
information.
Step 2:
Install shift cap assembly (if removed).
a. Position shift cap assembly onto three speed
transmission.
NOTE
Align shifting fork (2) with shift shaft. Assemble
with transmission set in INTERMEDIATE with
shaft sleeves pushed out to prevent hydraulic oil
from passing quad rings upon start up.
2
0721-79A
b. Install shift cap assembly mounting bolts.
Содержание PF-200
Страница 77: ...Drive Train Highway Class Paver Finishers A 77 BK 47 2 1 ...
Страница 117: ...Highway Class Paver Finishers Drive Train ...