Drive Train
Highway Class Paver/Finishers
A-69
DRIVE WHEEL SPINDLE AND
HUB ASSEMBLY
This task is for all machines except the PF-510.
REMOVAL
Step 1:
Remove wheel hub.
a. Remove lock nut (1).
b. Remove lock washer (2).
c. Remove inner lock nut (3).
d. Remove retaining washer (4).
e. Remove hub from spindle.
3
1
2
4
BK-164
Step 2:
Remove two bolts (5) that attach chain tensioner (6)
to spindle.
6
5
7
8
0760-87A
Step 3:
Remove spindle (7).
a. Secure lifting device to spindle shaft. Sling
housing and take up slack.
b. Remove four bolts (8) that secure spindle to
machine frame.
c. Lower spindle to floor.
DISASSEMBLY
Step 1:
Disassemble hub assembly.
a. Remove bearing cones.
b. Pull bearing cups.
0760-89
INSPECTION
Step 1:
Inspect bearings for wear and damage.
Step 2:
Inspect wheel studs and lug nuts for damage.
Step 3:
Inspect spindle weldment for cracks and damage.
Step 4:
Replace damaged or highly worn items.
ASSEMBLY
Step 1:
Assemble hub assembly.
a. Press bearing cups.
b. Install bearing cones.
IMPORTANT
Make sure bearings are oriented properly.
Содержание PF-200
Страница 77: ...Drive Train Highway Class Paver Finishers A 77 BK 47 2 1 ...
Страница 117: ...Highway Class Paver Finishers Drive Train ...