Highway Class Paver/Finishers
Drive Train
A-108
B
OGIE
W
HEEL
A
SSEMBLY
(W
HEELED
)
This procedure covers:
✓
Removal
Inspection/Specification
✓
Installation
✓
Disassembly
✓
Assembly
Adjustments
Special Cleaning
Component Test
Equipment Preparation
Machine Set-up
Special Tools
Fabricated Tools
• Machine blocked to prevent movement.
✓
None
✓
None
• Screed secured in the raised position.
• Hopper wings raised (blocked or chained in position).
• Battery disconnected.
Содержание PF-200
Страница 77: ...Drive Train Highway Class Paver Finishers A 77 BK 47 2 1 ...
Страница 117: ...Highway Class Paver Finishers Drive Train ...