28
Loosen 7x
M8x30 Sockethead cap and remove the E10440 “Belt cover”
.
Loosen 4x M12 nut to loosen the motor.
Loosen the M12 nut to release the belt tension.
Replace E01938 “V belt 1280”.
6.9
Safety check by a competent person
Safety checks of the hoisting equipment must be carried out at least once a year by a certified specialist.
Please check the local regulations for the frequency of the safety checks with the local authorities.
Exceptional ambient conditions or conditions of operation may require additional safety checks according to the
relevant accident prevention regulations for
“
Hoists, lifting and towing devices
”
(BGV D8).
The equipment must be subjected to a general overhaul after 200 hours at the latest, of
operation, by the manufacturer. All results of the annual and extraordinary inspections
must be entered at the back of the manual. This is the responsibility of the operating company.
Содержание 200VMB
Страница 1: ...Original instructions in English OPERATING INSTRUCTIONS 200VMB VERSION 1 2...
Страница 22: ...22 2 Use a brass drift to tap out the side liners...
Страница 23: ...23...