or using PSCP:
pscp -‐scp ssl_key.pem root@<address of unit>:/etc/config/
pscp -‐scp ssl_cert.pem root@<address of unit>:/etc/config/
PuTTY and the PSCP utility can be downloaded from:
http://www.chiark.greenend.org.uk/~sgtatham/putty/download.htm
l
More detailed documentation on the PSCP can be found:
http://the.earth.li/~sgtatham/putty/0.58/htmldoc/Chapter5.html#pscp
15.8.4 Launching the HTTPS Server
Note that the easiest way to enable the HTTPS server is from the web Management Console. Simply click the
appropriate checkbox in
Network -‐> Services -‐> HTTPS Server
and the HTTPS server will be activated (assuming the
ssl_key.pem
&
ssl_cert.pem
files exist in the
/etc/config
directory).
Alternatively
inetd
can be configured to launch the secure
fnord
server from the command line of the unit as follows.
Edit the
inetd
configuration file. From the unit command line:
vi /etc/config/inetd.conf
Append a line:
443 stream tcp nowait root sslwrap -‐cert /etc/config/ssl_cert.pem -‐key /etc/config/ssl_key.pem -‐exec /bin/httpd
/home/httpd"
Save the file and signal
inetd
of the configuration change.
kill -‐HUP `cat /var/run/inetd.pid`
The HTTPS server should be accessible from a web client at a URL similar to this:
https://<common name of unit>
More detailed documentation about the
openssl
utility can be found at the website:
http://www.openssl.org/
15.9 Power Strip Control
The
console server
supports a growing list of remote power-‐control devices (RPCs) that you can configure using the
Management Console as described in Chapter 8. These RPCs are controlled using the open source
PowerMan
and
Network UPS Tools
and with Black Box’s
pmpower
utility.
15.9.1 The PowerMan tool
PowerMan provides power management in a data center or compute cluster environment. It performs operations such
as power on, power off, and power cycle via remote power controller (RPC) devices.
Synopsis
powerman
[-‐option] [targets]
pm
[-‐option] [targets]
Options
-‐1, -‐-‐on
Power ON targets.
-‐0, -‐-‐off
Power OFF targets.
-‐c, -‐-‐cycle
Power cycle targets.
-‐r, -‐-‐reset
Assert hardware reset for targets (if implemented by RPC).