MK / MKT (E5) 03/2019
page 54/158
“Ramp” and “Step” mode example (representation of a temperature course)
W/°C
t/min.
0
20
40
60
80
100
10
30
40
60
70
100
130
1
2
3
4
5
6
7
8
Corresponding program table
Section No.
Duration
[hh:mm:ss]
Temperature
[°C]
Fan (MK 56)
[%]
Ramp or Step
1
00:10:00
40.0
xxxx
Step
2
00:20:00
60.0
xxxx
Step
3
00:10:00
80.0
xxxx
Step
4
00:20:00
40.0
xxxx
Step
5
00:10:00
40.0
xxxx
Ramp
6
00:30:00
80.0
xxxx
Ramp
7
00:30:00
80.0
xxxx
Ramp
8
00:00:01
20.0
xxxx
Ramp
9.7.3 Special controller functions via operation lines
You can define the switching state of up to 16 operation lines (control contacts). They are used to activate
/ deactivate special controller functions.
•
Operation line “Idle mode” activates / deactivates the operating mode “Idle mode”.
•
Operation lines „Switching output 1“ up to „4“ can be used to turn on and off any equipment connected
to the zero-voltage switching outputs (DIN sockets (7) and (8) (option, chap. 19).
•
Operation line “Compr. air dryer” serves to activate the compressed air dryer (option, chap. 20.6).
•
Operation line “Compressed air valve” serves to open the solenoid valve of the compressed air con-
nection (for options compressed air connection, chap. 20.5, or compressed air dryer, chap. 20.6)
•
Operation line “Anti-condensation protection” serves to switch the anti-condensation protection (chap.
The other operation lines are without function.
Содержание MK 115
Страница 129: ...MK MKT E5 03 2019 page 129 158 Heating up time MK 115 Cooling down time MK 115 Temp C Time min Time min Temp C ...
Страница 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Страница 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Страница 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Страница 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Страница 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Страница 143: ...MK MKT E5 03 2019 page 143 158 25 Certificates and declarations of conformity 25 1 EU Declaration of Conformity for MK ...
Страница 144: ...MK MKT E5 03 2019 page 144 158 ...
Страница 145: ...MK MKT E5 03 2019 page 145 158 ...
Страница 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Страница 147: ...MK MKT E5 03 2019 page 147 158 ...
Страница 148: ...MK MKT E5 03 2019 page 148 158 ...
Страница 150: ...MK MKT E5 03 2019 page 150 158 ...
Страница 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Страница 159: ......