MK / MKT (E5) 03/2019
page 155/158
We hereby declare that the following measures have been taken /
Wir erklären, dass folgende
Maßnahmen getroffen wurden:
Hazardous substances were removed from the unit including component parts, so that no hazard ex-
ists for any person in the handling or repair of these items /
das Gerät/Bauteil wurde von Gefahrstoffen be-
freit, so dass bei Handhabung/Reparaturen für die betreffenden Person keinerlei Gefährdung besteht
The unit was securely packaged and properly identified /
das Gerät wurde sicher verpackt und vollständig
gekennzeichnet.
Information about the hazardousness of the shipment (if required) has been provided to the transporter
/
der Spediteur wurde (falls vorgeschrieben) über die Gefährlichkeit der Sendung informiert
.
We hereby commit ourselves and guarantee that we will indemnify BINDER GmbH for all damages that
are a consequence of incomplete or incorrect information provided by us, and that we will exempt
BINDER GmbH from eventual damage claims by third parties./
Wir versichern, dass wir gegenüber BINDER
für jeden Schaden, der durch unvollständige und unrichtige Angaben entsteht, haften und BINDER gegen eventuell
entstehende Schadenansprüche Dritter freistellen.
We are aware that, in accordance with Article 823 of the German Civil Code (BGB), we are directly liable
with regard to third parties, in this instance especially the employees of BINDER GmbH, who have been
entrusted with the handling / repair of the unit / component. /
Es ist uns bekannt, dass wir gegenüber Dritten –
hier insbesondere mit der Handhabung/Reparatur des Geräts/des Bauteils betraute Mitarbeiter der Firma BINDER -
gemäß §823 BGB direkt haften
Name:
_______________________________________________________________________
Position/Title: _______________________________________________________________________
Date /
Datum
: _______________________________________________________________________
Signature /
Unterschrift
: _______________________________________________________________
Company stamp
/
Firmenstempel
:
Equipment that is returned to the factory for repair must be accompanied by a completely filled
out contamination clearance certificate. For service and maintenance on site, such a contami-
nation clearance certificate must be submitted to the service technician before the start of any
work. No repair or maintenance of the equipment is possible, without a properly filled out con-
tamination clearance certificate.
Содержание MK 115
Страница 129: ...MK MKT E5 03 2019 page 129 158 Heating up time MK 115 Cooling down time MK 115 Temp C Time min Time min Temp C ...
Страница 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Страница 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Страница 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Страница 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Страница 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Страница 143: ...MK MKT E5 03 2019 page 143 158 25 Certificates and declarations of conformity 25 1 EU Declaration of Conformity for MK ...
Страница 144: ...MK MKT E5 03 2019 page 144 158 ...
Страница 145: ...MK MKT E5 03 2019 page 145 158 ...
Страница 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Страница 147: ...MK MKT E5 03 2019 page 147 158 ...
Страница 148: ...MK MKT E5 03 2019 page 148 158 ...
Страница 150: ...MK MKT E5 03 2019 page 150 158 ...
Страница 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Страница 159: ......