MK / MKT (E5) 03/2019
page 123/158
Chamber size
56
115
240
720
Electrical data
(model version MK056-230V)
IP-system of protection acc. to EN 60529
IP
20
20
20
20
Nominal voltage (+/-10%) at 50 Hz power
frequency
V
230
400
400
400
Current type
1N~
3N~
3N~
3N~
Nominal power
kW
2.80
3.50
5.60
8.70
Power plug
IEC con-
nector plug
(grounded)
CEE plug 5
poles
16 Amp
CEE plug 5
poles
16 Amp
CEE plug 5
poles
16 Amp
Over-voltage category acc.
to
IEC 61010-1
II
II
II
II
Pollution degree acc. to IEC 61010-1
2
2
2
2
Over-current release category B, internal
A
16
3x 16
3x 16
3x 16
Different electrical data for chambers constructed for the USA and Canada
(model version MK056-240V)
Nominal voltage (+/-10%) at 60 Hz power
frequency
V
240
--
--
--
Current type
2~
--
--
--
Electrical data of the voltage and frequency changer
IP-system of protection acc. to EN 60529
IP
--
23
23
23
Nominal voltage (+/-10%)
at 60 Hz power frequency (input side)
V
--
480
480
480
Current type
--
3N~
3N~
3N~
Nominal power
kW
--
9
9
13
Over-voltage category acc.
to
IEC 61010-1
--
II
II
II
Pollution degree acc. to IEC 61010-1
--
2
2
2
Fuse
A
--
16
16
16
Environment-specific data
Noise level (mean value)
dB(A)
59
62
62
65
Noise level (mean value) with optional
compressed air dryer (short-term)
dB(A)
***
85
85
85
Noise level (mean value) with voltage and
frequency changer
dB(A)
--
67
67
67
Energy consumption at +20 °C /
68 °F
Wh/h
600
650
1300
1900
Filling weight of refrigerant R 452A (GWP
2140)
kg /
lbs.
1.00 /
2.20
1,20 /
2.65
1,40 /
3.09
3,20 /
7.10
***
Data not yet determined
Note:
Chambers with voltage and frequency changer: Average heating up time reduced by 0.3 K/min
each.
All technical data is specified for unloaded chambers with standard equipment at an ambient temperature
of +22 °C +/- 3 °C /
71.6 °F +/- 5.4 °F
and a power supply voltage fluctuation of +/-10%. Technical data is
determined in accordance to BINDER Factory Standard Part 2:2015 and DIN 12880:2007.
All indications are average values, typical for chambers produced in series. We reserve the right to
change technical specifications at any time.
If the chamber is fully loaded, the specified heating up and cooling down times may vary ac-
cording to the load.
Содержание MK 115
Страница 129: ...MK MKT E5 03 2019 page 129 158 Heating up time MK 115 Cooling down time MK 115 Temp C Time min Time min Temp C ...
Страница 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Страница 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Страница 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Страница 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Страница 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Страница 143: ...MK MKT E5 03 2019 page 143 158 25 Certificates and declarations of conformity 25 1 EU Declaration of Conformity for MK ...
Страница 144: ...MK MKT E5 03 2019 page 144 158 ...
Страница 145: ...MK MKT E5 03 2019 page 145 158 ...
Страница 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Страница 147: ...MK MKT E5 03 2019 page 147 158 ...
Страница 148: ...MK MKT E5 03 2019 page 148 158 ...
Страница 150: ...MK MKT E5 03 2019 page 150 158 ...
Страница 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Страница 159: ......