
54733-10BA2L
1 – 132
02.2017
10 Source Replacement
Volume 1
Preparation
All necessary work has to be prepared well so that it can be carried
out quickly to keep exposure to the unshielded source to a mini-
mum. Using a drawing of the shielding, you should plan the best
procedure and have the following tools handy:
•
Allen keys sizes 4, 5, 6, 8 and 10
•
2 pairs of pliers (e.g. a pair of combination pliers or multigrip
pliers)
Cordon off an area consistent with the activity of the source. Pre-
vent persons from approaching.
Prepare a suitable, clean space, if possible with an auxiliary shield-
ing (shielding vessel, lead bricks, concrete stones, etc.) and place
the source holder and the source there on a piece of paper to pro-
tect it against dirt.
Turn the shieldings to the “CLOSED” position and secure them. We
recommend placing the individual shielding upright. In particular,
secure the rotating cylinder against tipping over before you release
the head flange. Bring the transport shielding containing the new
source close to the measuring site and open it such that the new
source can be taken out and the old rod source put into the trans-
port shielding as quickly as possible.
If you are working with several sources, make sure that the
sources cannot be mixed up.
Содержание LB 480
Страница 2: ......
Страница 3: ...1 2 3 Volume 1 Safety Manual Volume 2 Installing SENSseries Volume 3 Operation with HART Communicator...
Страница 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Страница 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Страница 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Страница 55: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 55 Volume 1 5 Explosion Protection 1 5 9 ATEX Certificate...
Страница 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Страница 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Страница 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Страница 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Страница 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Страница 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Страница 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Страница 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Страница 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Страница 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Страница 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Страница 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Страница 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Страница 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Страница 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Страница 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Страница 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Страница 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Страница 109: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 7 Functional Safety 1...
Страница 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Страница 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Страница 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Страница 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Страница 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Страница 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Страница 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Страница 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Страница 254: ...54733 10BA2L 2 254 02 2017 5 Technical Information Volume 2 LB 480 Dimensions in mm Abmessungen in mm...
Страница 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Страница 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Страница 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Страница 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Страница 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Страница 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Страница 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Страница 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Страница 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Страница 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Страница 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...