
54733-10BA2L
1 – 116
02.2017
9 Radiation Protection
Volume 1
9.2.2
Radiation Exposure during Installation of the
Shielding
The shieldings of measuring systems are usually designed such that
the limit of the control area is in a given distance (in most cases less
than one meter) around the shielding, and it does not matter
whether point or rod sources are being used and how high their
activity is. A simplified calculation of the radiation exposure during
installation of the shielding is possible with sufficient accuracy using
the dose rate data printed on the type plate, measured in 1 m dis-
tance from the shielding. The radiation exposure D can be calcu-
lated according to the following formula:
D = DR x t x 4
D = accumulated dose during assembly in Sv
DR = dose rate on the type plate of the shielding in µSv/h
t = time needed for the installation with shielding in h
If the work process is prepared well, you may expect a working
time of less than 20 minutes to perform work such as installation of
the shielding or operating the shutter.
Calculation example
DR = 3µSv
t = 20min (1/3h)
D = 3 x 1/3 x 4 = 4µSv/h
If we compare this dose with the permissible annual dose of 1 mSv
for persons who are not exposed to radiation on their job, this work
may be carried out 250 times per year by one and the same person.
Содержание LB 480
Страница 2: ......
Страница 3: ...1 2 3 Volume 1 Safety Manual Volume 2 Installing SENSseries Volume 3 Operation with HART Communicator...
Страница 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Страница 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Страница 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Страница 55: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 55 Volume 1 5 Explosion Protection 1 5 9 ATEX Certificate...
Страница 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Страница 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Страница 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Страница 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Страница 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Страница 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Страница 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Страница 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Страница 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Страница 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Страница 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Страница 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Страница 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Страница 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Страница 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Страница 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Страница 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Страница 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Страница 109: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 7 Functional Safety 1...
Страница 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Страница 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Страница 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Страница 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Страница 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Страница 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Страница 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Страница 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Страница 254: ...54733 10BA2L 2 254 02 2017 5 Technical Information Volume 2 LB 480 Dimensions in mm Abmessungen in mm...
Страница 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Страница 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Страница 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Страница 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Страница 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Страница 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Страница 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Страница 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Страница 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Страница 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Страница 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...