background image

Bennett Site Master Instruction Manual 

Table of Contents 

TABLE OF CONTENTS 

IMPORTANT SAFETY INSTRUCTIONS 

3

 

General Information .......................................................................................................................................................................................................................... 4

 

Hazardous locations .......................................................................................................................................................................................................................... 4

 

Codes and Standards........................................................................................................................................................................................................................ 4

 

Unauthorized Alteration of Bennett Products ....................................................................................................................................................................... 4

 

Abbreviations and Acronyms ........................................................................................................................................................................................................ 4

 

INSTALLATION 

5

 

Specifications ....................................................................................................................................................................................................................................... 5

 

Recommended Materials ................................................................................................................................................................................................................ 5

 

Dispenser Overview ........................................................................................................................................................................................................................... 6

 

Mechanical Installation Requirements ...................................................................................................................................................................................... 7

 

Site Master SP Footprint ................................................................................................................................................................................................................. 8

 

Wiring Instructions ............................................................................................................................................................................................................................ 9

 

Determining the Number of Wires Required ......................................................................................................................................................................... 9

 

Point of Sale (POS) Communication........................................................................................................................................................................................... 9

 

Beginning the Wiring Process .................................................................................................................................................................................................... 10

 

Installing Conduit at the Site Master ...................................................................................................................................................................................... 10

 

OPERATION 

13

 

Door Key Locks................................................................................................................................................................................................................................. 13

 

SSP Payment Module .................................................................................................................................................................................................................... 14

 

Gaining Access to Managers Mode ......................................................................................................................................................................................... 14

 

MAINTENANCE 

15

 

Fuse Board (P/N 130809) ............................................................................................................................................................................................................. 15

 

Power Supply Board (P/N 111209) .......................................................................................................................................................................................... 16

 

Cleaning .............................................................................................................................................................................................................................................. 17

 

PARTS 

19

 

To Place an Order for Parts ......................................................................................................................................................................................................... 19

 

Door Upper Alpha Numeric/EMV 7” Display (P4913s2) ................................................................................................................................................. 20

 

SCHEMATICS 

21

 

Field Wiring ........................................................................................................................................................................................................................................ 21

 

Footprint ............................................................................................................................................................................................................................................. 23

 

 

 

 

 

Содержание SITE MASTER EMV

Страница 1: ...mation Installation Operation Maintenance Parts Schematics Only Trained Personnel May Work on This Equipment READ THIS MANUAL This manual has important information for safe installation and operation...

Страница 2: ...799 6202 Email sales bennettpump com or salesintl bennettpump com Website www bennettpump com For new manuals visit our web page at www bennettpump com IMPORTANT Examine the shipment immediately upon...

Страница 3: ......

Страница 4: ......

Страница 5: ...al Installation Requirements 7 Site Master SP Footprint 8 Wiring Instructions 9 Determining the Number of Wires Required 9 Point of Sale POS Communication 9 Beginning the Wiring Process 10 Installing...

Страница 6: ...Bennett Site Master Instruction Manual Table of Contents ii Page Intentionally Left Blank...

Страница 7: ...terminal or submerged pump before working on it Maintenance repairs must be done by authorized personnel only Warranty work may only be performed by Bennett certified technicians To prevent electric s...

Страница 8: ...ional Fire Code 2018 Edition UNAUTHORIZED ALTERATION OF BENNETT PRODUCTS DANGER BEFORE PERFORMING ANY TYPE OF SERVICE TO THE DISPENSERS BE SURE TO SHUT OFF ALL ELECTRICAL SUPPLIES AND SECURE THEM IN T...

Страница 9: ...DIMENSIONS Refer to Footprint Diagram 125927 P4208 located inside the Site Master or on the USB provided Site Master Series Maximum 19 25 32 width x 12 depth x 42 height Site Master Series Estimated S...

Страница 10: ...erminal strip and converts the 120VAC into the 12VDC and 24VDC needed for the module to operate The payment module receives power from the Power Supply through the J5 connector on the SBC2 CPU Board a...

Страница 11: ...the unit for conduit connections for the Site Master 2 Anchor the Site Master to the island with four bolts anchor bolts through the base frame Note When anchoring the Site Master always level the uni...

Страница 12: ...A Installation must be in accordance with national electric code NFPA 70 The Automotive and Marine Service Code NFPA 30A and all state and local codes B Use only Underwriters Listed Threaded Rigid Co...

Страница 13: ...Violet RS 485 positive 1 x 18ga Common 1 x 18ga Yellow RS 485 negative RS 485 wires should be twisted together no less than 3 turns per foot to reduce the effects of electrical noise on the communicat...

Страница 14: ...ce panel ground bar Note Use 15 Amp neutral breaking circuit breakers which are supplied by the customer 6 Connect AC Power a Connect the neutral white 14 gauge wire to position 2 of the terminal stri...

Страница 15: ...tallation 3 Pull a Green 12 ga stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Term...

Страница 16: ...ATION WIRING DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All...

Страница 17: ...for the other lock 5 To unlock either door turn the key counterclockwise until it stops POWER SWITCH WARNING To prevent electric shock make sure the current is off at the circuit breaker s and the br...

Страница 18: ...on or off When power is applied to the Site Master the Bennett Logo will appear for approximately 3 seconds as shown in Figure 2 3 Note PLEASE PAY INSIDE will be displayed as shown in Figure 2 4 only...

Страница 19: ...tem DC voltages then are sent over to the SBC2 Board through a multi pin conductor from connector J1 of the Power Board to connector J2 on the SBC2 Board The standard glass body fuses are located on a...

Страница 20: ...n of the connections to the terminal strips of all the connections used on the power supply board as shown in Figure 3 3 J1 AC Input A 5 position header is used to receive incoming AC power J2 12 VDC...

Страница 21: ...llow the suggested maintenance frequency and record results in the maintenance log Keep in a readily accessible location CLEANING PAINTED SURFACES 1 Wash the dispenser in a solution of warm water and...

Страница 22: ...Bennett Site Master Instruction Manual Maintenance 18 Page Intentionally Left Blank...

Страница 23: ...visit our web page at www bennettpump com ALL ORDERS MUST INCLUDE THE FOLLOWING INFORMATION Note Many electronic circuit boards have a factory rebuilt equivalent All rebuilt boards have a part number...

Страница 24: ...cuit Board Asm Soft Key 2 7 126972 Display 1 8 132001 Bracket Display CPU Mount 2 9 132008 Bracket Mount SBC 1 10 129313 Circuit Board Assembly SBC2 1 11 113724 Card Reader MAGTEK 1 12 VARIOUS Bracket...

Страница 25: ...a stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Terminate the other end at the ma...

Страница 26: ...DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All wiring gauge...

Страница 27: ...Bennett Site Master Instruction Manual Schematics 23 FOOTPRINT...

Страница 28: ...Bennett 1218 E Pontaluna Road Spring Lake MI 49456 USA 800 235 7618 Outside USA 231 798 1310 sales bennettpump com www bennettpump com...

Отзывы: