background image

Bennett Site Master Instruction Manual 

Operation

 

14 

SSP PAYMENT MODULE  

CAUTION: 

DO NOT REMOVE encrypted PIN Pad or secure card reader from the payment panel. If either 
component is removed, activation will be lost and it will become inoperable. It cannot be re-
activated at the site; it must be returned to Bennett Pump for replacement. 

The SSP option allows the customer to pay for fuel with a credit card or debit card and receive a receipt.  The dispenser is connected to a 
financial network through a POS system to allow approval of the cards at the time they are inserted into the dispenser.

 

Refer to the 

Simply Secure Payment PCI 3.1 (Large Display w/ SBC2) Programming, Service, and Parts Manual

 for more information 

POWERING UP THE MODULE 

The display module receives its power from the power board within the Site Master. There are no power switches on the payment 
module. The only way to power the module on or off is by turning the power to the Site Master on or off.

 

 

When power is applied to the Site Master, the Bennett Logo will appear for approximately 3 seconds as shown in 

Figure 2.3

.  

Note

PLEASE PAY INSIDE

 

will be displayed as shown in 

Figure 2.4 

only if the module and/or POS (Point of Sale) has not been 

configured, installed at this time, or communication has been lost. 

 

 

Refer to 132544 Simply Secure Payment (SSP Large Display w/ SBC2) Programming, Service, and Parts Manual for 
Installation, Operation, Programming, and Service information 

GAINING ACCESS TO MA NAGERS MODE  

The Soft Keys on the right hand side of the display are the only keys used to enter into Managers Mode. The 
top Soft Key on the right is 1 and the bottom Soft Key on the right is 4. The code for entering into Managers 
Mode is 

122114

. Refer to 

Figure 2.5

 for soft key number locations.

 

 

Once the correct access code is entered, 

MANAGER MODE

:

 

00

 

will be displayed at the top of the display. Refer 

to the 

Simply Secure Payment PCI 3.1 (Large Display w/ SBC2) Programming, Service, and Parts Manual

 for 

programming and more information. 

 

 

 

 

 

 

 

 

 

PLEASE PAY INSIDE 

 

 

 

 

 

 

 

 

 

 

Figure 2.4 - Non-Configured Module

 

Figure 2.3- Bennett Logo (Power Up)

 

 

 

 

 

 

 

 

 

 

Figure 2.5 – Right Hand Side Soft Keys

 

Содержание SITE MASTER EMV

Страница 1: ...mation Installation Operation Maintenance Parts Schematics Only Trained Personnel May Work on This Equipment READ THIS MANUAL This manual has important information for safe installation and operation...

Страница 2: ...799 6202 Email sales bennettpump com or salesintl bennettpump com Website www bennettpump com For new manuals visit our web page at www bennettpump com IMPORTANT Examine the shipment immediately upon...

Страница 3: ......

Страница 4: ......

Страница 5: ...al Installation Requirements 7 Site Master SP Footprint 8 Wiring Instructions 9 Determining the Number of Wires Required 9 Point of Sale POS Communication 9 Beginning the Wiring Process 10 Installing...

Страница 6: ...Bennett Site Master Instruction Manual Table of Contents ii Page Intentionally Left Blank...

Страница 7: ...terminal or submerged pump before working on it Maintenance repairs must be done by authorized personnel only Warranty work may only be performed by Bennett certified technicians To prevent electric s...

Страница 8: ...ional Fire Code 2018 Edition UNAUTHORIZED ALTERATION OF BENNETT PRODUCTS DANGER BEFORE PERFORMING ANY TYPE OF SERVICE TO THE DISPENSERS BE SURE TO SHUT OFF ALL ELECTRICAL SUPPLIES AND SECURE THEM IN T...

Страница 9: ...DIMENSIONS Refer to Footprint Diagram 125927 P4208 located inside the Site Master or on the USB provided Site Master Series Maximum 19 25 32 width x 12 depth x 42 height Site Master Series Estimated S...

Страница 10: ...erminal strip and converts the 120VAC into the 12VDC and 24VDC needed for the module to operate The payment module receives power from the Power Supply through the J5 connector on the SBC2 CPU Board a...

Страница 11: ...the unit for conduit connections for the Site Master 2 Anchor the Site Master to the island with four bolts anchor bolts through the base frame Note When anchoring the Site Master always level the uni...

Страница 12: ...A Installation must be in accordance with national electric code NFPA 70 The Automotive and Marine Service Code NFPA 30A and all state and local codes B Use only Underwriters Listed Threaded Rigid Co...

Страница 13: ...Violet RS 485 positive 1 x 18ga Common 1 x 18ga Yellow RS 485 negative RS 485 wires should be twisted together no less than 3 turns per foot to reduce the effects of electrical noise on the communicat...

Страница 14: ...ce panel ground bar Note Use 15 Amp neutral breaking circuit breakers which are supplied by the customer 6 Connect AC Power a Connect the neutral white 14 gauge wire to position 2 of the terminal stri...

Страница 15: ...tallation 3 Pull a Green 12 ga stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Term...

Страница 16: ...ATION WIRING DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All...

Страница 17: ...for the other lock 5 To unlock either door turn the key counterclockwise until it stops POWER SWITCH WARNING To prevent electric shock make sure the current is off at the circuit breaker s and the br...

Страница 18: ...on or off When power is applied to the Site Master the Bennett Logo will appear for approximately 3 seconds as shown in Figure 2 3 Note PLEASE PAY INSIDE will be displayed as shown in Figure 2 4 only...

Страница 19: ...tem DC voltages then are sent over to the SBC2 Board through a multi pin conductor from connector J1 of the Power Board to connector J2 on the SBC2 Board The standard glass body fuses are located on a...

Страница 20: ...n of the connections to the terminal strips of all the connections used on the power supply board as shown in Figure 3 3 J1 AC Input A 5 position header is used to receive incoming AC power J2 12 VDC...

Страница 21: ...llow the suggested maintenance frequency and record results in the maintenance log Keep in a readily accessible location CLEANING PAINTED SURFACES 1 Wash the dispenser in a solution of warm water and...

Страница 22: ...Bennett Site Master Instruction Manual Maintenance 18 Page Intentionally Left Blank...

Страница 23: ...visit our web page at www bennettpump com ALL ORDERS MUST INCLUDE THE FOLLOWING INFORMATION Note Many electronic circuit boards have a factory rebuilt equivalent All rebuilt boards have a part number...

Страница 24: ...cuit Board Asm Soft Key 2 7 126972 Display 1 8 132001 Bracket Display CPU Mount 2 9 132008 Bracket Mount SBC 1 10 129313 Circuit Board Assembly SBC2 1 11 113724 Card Reader MAGTEK 1 12 VARIOUS Bracket...

Страница 25: ...a stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Terminate the other end at the ma...

Страница 26: ...DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All wiring gauge...

Страница 27: ...Bennett Site Master Instruction Manual Schematics 23 FOOTPRINT...

Страница 28: ...Bennett 1218 E Pontaluna Road Spring Lake MI 49456 USA 800 235 7618 Outside USA 231 798 1310 sales bennettpump com www bennettpump com...

Отзывы: