background image

Bennett Site Master Instruction Manual 

Installation

 

10 

BEGINNING THE WIRING PROCESS 

WARNING: 

FAILURE TO PROPERLY GROUND THE EQUIPMENT CAN CAUSE INJURY OR DAMAGE TO THE EQUIPMENT 
AND WILL VOID THE BENNETT LIMITED WARRANTY

WARNING: 

DO NOT TERMINATE THE GROUND AT THE NEUTRAL BAR OF A SUB-PANEL OR RELY ON METAL CONDUIT 
FOR THIS GROUND CONNECTION. EACH SITE MASTER’S GROUNDING POST MUST BE WITHIN 1-OHM 
RESISTANCE TO EARTH GROUND POTENTIAL. DO NOT USE WIRE NUTS ON GROUND CIRCUITS, USE ONLY 
COMPRESSION TYPE CONNECTORS. THIS IS REQUIRED TO INITIATE BENNETT’S LIMITED WARRANTY. 

CAUTION: 

Do not daisy-chain ground wires.  All ground circuits must be dedicated wires connected directly to the 
ground bar in the main electrical panel.  A direct connection to the site’s ground rod must be connected 
to the ground bar in the main electrical panel. 

CAUTION: 

Electronic power must be connected to a dedicated 15 Amp neutral breaking circuit breaker.  The Site 
Master is factory wired for 115/120V 50/60hz operation and must not be changed in the field. If this has 
been changed in the field, the warranty is voided.  

1.

 

Remove the lower rear panel of the pedestal and locate the inlet wiring electrical conduit.  

2.

 

Remove the cover from the Power Supply by removing the lower two screws and loosening the two screws on the top backside of 
the cover. 

3.

 

Place covers and screws in a location that will remind you to replace the cover once the wiring has been completed. 

4.

 

Pull the Site Master’s wires through the underground conduit and into the electronic enclosure. 

5.

 

Connect a Green Earth Ground 12-gauge (minimum), green stranded wire to the grounding lug near the Power Distribution Board. 
Terminate the other end at the main electrical service panel ground bar. 

Note: 

Use 15 Amp neutral breaking circuit breakers, which 

are supplied by the customer.  

6.

 

Connect AC Power 

a.

 

Connect the neutral white 14-gauge wire to position 2 of the terminal strip.  

b.

 

Connect the hot black 14-gauge wire to position 1 of the terminal strip for electronic power. 

Note: 

120 VAC installations L1 is 

hot and L2 is Neutral.   

7.

 

Connect Data Communication Wires through ¾” conduit. 

a.

 

Connect 1 Violet 18ga. (+ positive) wire to position 3 of the terminal strip. Connect the other end to the Interconnection Box (+ 
positive). 

b.

 

Connect 1 White 18ga. (common) wire to position 4 of the terminal strip. Connect the other end to the Interconnection Box 
(common). 

c.

 

Connect 1 Yellow 18ga. (- negative) wire to position 5 of the terminal strip. Connect the other end to the Interconnection Box (- 
negative). 

8.

 

Replace covers and screws. 

 

INSTALLING CONDUIT AT THE SITE MASTER  

WARNING: 

Per NFPA 70, a listed seal must be provided in each conduit run entering or leaving a Site Master. The 
sealing fitting shall be the first fitting after the conduit emerges from the earth or concrete.  

NOTES:   

 

All material (fittings, conductors, U-bolts, pipe clamps, etc.) running through the hydraulics must

 

be provided by the installer 

upon installation. 

 

Check with Federal, State, and Local Codes for conduit use in your area.   

 

Do not use PVC conduit. Use only Rigid metal conduit. 

 

Make sure that each Site Master has its own electrical underground conduit.  

 

Wiring from multiple Site Masters in a single conduit is not allowed.  

 

Make sure that vapor “seal offs” are properly installed on all conduits at and from each Site Master.  

 

Do not put non-pump related wires, such as price signs or speakers, in the same conduit as pump wiring.  

 

All conduit between the building and each Site Master should be a separate conduit run. 

For field installations, only one 

¾”

 Female NPT Electrical Conduit is opening is available. Refer to th

Site Master SP Footprint

 fo

measurements. 

 

Содержание SITE MASTER EMV

Страница 1: ...mation Installation Operation Maintenance Parts Schematics Only Trained Personnel May Work on This Equipment READ THIS MANUAL This manual has important information for safe installation and operation...

Страница 2: ...799 6202 Email sales bennettpump com or salesintl bennettpump com Website www bennettpump com For new manuals visit our web page at www bennettpump com IMPORTANT Examine the shipment immediately upon...

Страница 3: ......

Страница 4: ......

Страница 5: ...al Installation Requirements 7 Site Master SP Footprint 8 Wiring Instructions 9 Determining the Number of Wires Required 9 Point of Sale POS Communication 9 Beginning the Wiring Process 10 Installing...

Страница 6: ...Bennett Site Master Instruction Manual Table of Contents ii Page Intentionally Left Blank...

Страница 7: ...terminal or submerged pump before working on it Maintenance repairs must be done by authorized personnel only Warranty work may only be performed by Bennett certified technicians To prevent electric s...

Страница 8: ...ional Fire Code 2018 Edition UNAUTHORIZED ALTERATION OF BENNETT PRODUCTS DANGER BEFORE PERFORMING ANY TYPE OF SERVICE TO THE DISPENSERS BE SURE TO SHUT OFF ALL ELECTRICAL SUPPLIES AND SECURE THEM IN T...

Страница 9: ...DIMENSIONS Refer to Footprint Diagram 125927 P4208 located inside the Site Master or on the USB provided Site Master Series Maximum 19 25 32 width x 12 depth x 42 height Site Master Series Estimated S...

Страница 10: ...erminal strip and converts the 120VAC into the 12VDC and 24VDC needed for the module to operate The payment module receives power from the Power Supply through the J5 connector on the SBC2 CPU Board a...

Страница 11: ...the unit for conduit connections for the Site Master 2 Anchor the Site Master to the island with four bolts anchor bolts through the base frame Note When anchoring the Site Master always level the uni...

Страница 12: ...A Installation must be in accordance with national electric code NFPA 70 The Automotive and Marine Service Code NFPA 30A and all state and local codes B Use only Underwriters Listed Threaded Rigid Co...

Страница 13: ...Violet RS 485 positive 1 x 18ga Common 1 x 18ga Yellow RS 485 negative RS 485 wires should be twisted together no less than 3 turns per foot to reduce the effects of electrical noise on the communicat...

Страница 14: ...ce panel ground bar Note Use 15 Amp neutral breaking circuit breakers which are supplied by the customer 6 Connect AC Power a Connect the neutral white 14 gauge wire to position 2 of the terminal stri...

Страница 15: ...tallation 3 Pull a Green 12 ga stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Term...

Страница 16: ...ATION WIRING DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All...

Страница 17: ...for the other lock 5 To unlock either door turn the key counterclockwise until it stops POWER SWITCH WARNING To prevent electric shock make sure the current is off at the circuit breaker s and the br...

Страница 18: ...on or off When power is applied to the Site Master the Bennett Logo will appear for approximately 3 seconds as shown in Figure 2 3 Note PLEASE PAY INSIDE will be displayed as shown in Figure 2 4 only...

Страница 19: ...tem DC voltages then are sent over to the SBC2 Board through a multi pin conductor from connector J1 of the Power Board to connector J2 on the SBC2 Board The standard glass body fuses are located on a...

Страница 20: ...n of the connections to the terminal strips of all the connections used on the power supply board as shown in Figure 3 3 J1 AC Input A 5 position header is used to receive incoming AC power J2 12 VDC...

Страница 21: ...llow the suggested maintenance frequency and record results in the maintenance log Keep in a readily accessible location CLEANING PAINTED SURFACES 1 Wash the dispenser in a solution of warm water and...

Страница 22: ...Bennett Site Master Instruction Manual Maintenance 18 Page Intentionally Left Blank...

Страница 23: ...visit our web page at www bennettpump com ALL ORDERS MUST INCLUDE THE FOLLOWING INFORMATION Note Many electronic circuit boards have a factory rebuilt equivalent All rebuilt boards have a part number...

Страница 24: ...cuit Board Asm Soft Key 2 7 126972 Display 1 8 132001 Bracket Display CPU Mount 2 9 132008 Bracket Mount SBC 1 10 129313 Circuit Board Assembly SBC2 1 11 113724 Card Reader MAGTEK 1 12 VARIOUS Bracket...

Страница 25: ...a stranded THHN ground wire through the junction box and wiring through and secure at grounding post near the terminal strip in the Site Master s electrical enclosure Terminate the other end at the ma...

Страница 26: ...DIAGRAM 1 All wiring must be installed and used in accordance with the national electrical code NFPA 70 Automotive and marine service code NFPA 30A state and local electrical codes 2 All wiring gauge...

Страница 27: ...Bennett Site Master Instruction Manual Schematics 23 FOOTPRINT...

Страница 28: ...Bennett 1218 E Pontaluna Road Spring Lake MI 49456 USA 800 235 7618 Outside USA 231 798 1310 sales bennettpump com www bennettpump com...

Отзывы: