Bennett Site Master Instruction Manual
Installation
7
MECHANICAL INSTALLAT ION REQUIREMENTS
Note:
The Site Master must be mounted on a concrete foundation and at least 10 ft. (3 m) from any building opening. Follow the
procedure below for mounting instructions.
1.
Refer to the Site Master SP Footprint Diagram (125927 – P4208) shown on the next page or on the USB provided located inside the
unit for conduit connections for the Site Master.
2.
Anchor the Site Master to the island with four ½” bolts anchor bolts through the base frame.
Note
: When anchoring the Site Master,
always level the unit with shims before bolting to the island. DO NOT SHIM MIDDLE OF RAIL BASE TO BOLT DOWN THE SITE MASTER.
SHIM ONLY NEAR BOLTS.
Figure 1.3
3.
Place the shims at the location of the anchor bolts so the Site Master frame is not distorted when the anchor bolts are tightened down.
Note
: THE SITE MASTER MUST BE BOLTED TO THE ISLAND. DO NOT SKIP THIS STEP.
Figure 0.3 –Anchor Bolt Locations
Содержание SITE MASTER EMV
Страница 3: ......
Страница 4: ......
Страница 6: ...Bennett Site Master Instruction Manual Table of Contents ii Page Intentionally Left Blank...
Страница 22: ...Bennett Site Master Instruction Manual Maintenance 18 Page Intentionally Left Blank...
Страница 27: ...Bennett Site Master Instruction Manual Schematics 23 FOOTPRINT...