Installation and Operation Manual
BEKOKAT
®
V01 /11-046
81 / 88
7.3
Maintenance schedule
Carefully perform the maintenance according to the following points.
Posit
ion
Activity
Weekly
Monthl
y
Annuall
y
1
Check display of SET and ACTUAL temperature.
x
2
Inspect operating pressure.
x
3
Inspect the volume flow rate.
x
4
Implement a general visual inspection. Pay attention to
unusual
occurrences,
damage
and
possible
malfunctions in ongoing operation.
x
5
Check the indicator light "H6". The indicator light is
inactive during normal operation.
x
6
Check the function of valves V1 and V2.
x
7
Function test of safety valves X4
Turn the release button counter-clockwise until a clear
blow out of the operating medium is audible.
Then turn the venting release knob clockwise until it
stops.
It is the duty of the operator to ensure that this work is
carried out only by authorised skilled technical
personnel.
x
8
Check that the nozzle X5 (see P & I diagramme) on the
rear side of the catalyst reactor is firmly and tightly
closed.
This nozzle is not available in all versions.
x
9
Analyse the compressed air quality at the outlet on the
BEKOKAT
®
.
We will be pleased to advise you how to do this.
x