Installation and Operation Manual
BEKOKAT
®
V01 /11-046
67 / 88
5.8
Re-commissioning after shut down
If the
BEKOKAT
®
is only put back into operation after a long downtime, proceed as with initial
commissioning.
Check, particularly after maintenance or repair, if the
BEKOKAT
®
is fully piped and electrically
connected. If not, then initiate a correct installation.