Decommissioning for service, maintenance or repair
Always proceed as follows to decommission the plant for servicing, maintenance or repairs:
1st Turn off the
BEKOKAT
®
master switch.
2nd Open the bypass-line (not included).
3rd Close the shut-off valves in front of and behind the
BEKOKAT
®
.
4th Before starting work, the
BEKOKAT
®
system must be depressurised.
Use the safety valve X4 installed at the compressed air inlet.
5th De-energize the system via an external disconnecting device.
6th Let the system cool down.
The cooling can take up to 48 hours.