REPLACING THE FIRE
Once the boiler has been serviced, the fire can be
replaced.
Locate the fire flue spigot into the boiler canopy and
whilst ensuring that the down-draught diverter on
the fire unit passes over the boiler controls heat
shield, push the fire back against the backing
plate. The fire is secured to the backing plate
using the screws previously removed.
Re-connect the gas supply pipe to the fire inlet.
EXAMINATION AND ASSEMBLY OF
COMPONENT PARTS
Examine the coalbed for damage and ensure that the
apertures are free from blockages. If any damage has
occurred then a new coalbed should be fitted. The
coalbed is re-fitted by lowering it onto the location pins.
Examine the glass frame sealing rope on the fire and if
any damage has occurred, fit a new one.
Examine the glass frame assembly and if it is in any
way damaged, then a new one must be fitted. If
satisfactory, the glass frame assembly should now be
fitted. Lower the glass frame assembly into its bottom
location positions and push back onto the sealing rope.
Engage the clips onto the front edge of the glass frame
and push down to lock. The centre clip should be
secured before the outer clips.
RECOMMISSIONING
After servicing the appliance it must be
recommissioned by refering to the instructions
contained in the section “Commissioning the Fire”.
Down-Draught
Diverter
Fire Flue
Spigot
Boiler Canopy
Controls Heat
Shield
Glass Frame
Sealing Rope
23
Supply Pipe