Copyright 2007 Baker Hughes Company.
18 | DPI 610/615 IS Instruction Manual–English
Chapter
4.
Taking Measurements
4.7 Leak Test (LEAK TEST) Task
•
If required, use the
INPUT
key to change pressure units.
•
Set-up the leak test WAIT and DURATION times to the required values as shown below. A
minimum wait period of 3 minutes is recommended.
•
Close the vent valve and pressurize the device/system to the required
LEAK TEST
pressure.
•
Press the
RUN
(F2)
key to start the leak test. When completed, the beeper sounds and the
leak test results are written to the display.
A
External pressure source
B
Pressure regulator
C
Device/system under test
PRESSURE INT
RUN
CHANGE
VALUE
WAIT
DURATION
START PRESS
STOP PRESS
PRESS CHANGE
LEAK RATE
TASK : LEAKTEST
SNAPSHOT MODE
TASK : ADVANCED
SNAPSHOT MODE
PRESSURE INT
CHANGE
VALUE
RUN
CHANGE
VALUE
RUN
SET WAIT TIME
SET DURATION
TASK : ADVANCED
SNAPSHOT MODE
PRESSURE INT
WAIT
180
secs
DURATION 60
secs
START PRESS
STOP PRESS
PRESS CHANGE
LEAK RATE
WAIT 180
secs
DURATION
60
secs
START PRESS
STOP PRESS
PRESS CHANGE
LEAK RATE
Содержание Druck DPI 610 IS
Страница 1: ...Druck com DPI 610 615 IS Intrinsically Safe Portable Pressure Calibrator Instruction Manual...
Страница 2: ......
Страница 6: ...Copyright 2007 Baker Hughes Company iv DPI 610 615 IS Instruction Manual English...
Страница 10: ...Copyright 2007 Baker Hughes Company viii DPI 610 615 IS Instruction Manual English...
Страница 20: ...Copyright 2007 Baker Hughes Company 10 DPI 610 615 IS Instruction Manual English Chapter 2 Getting Started...
Страница 38: ...Copyright 2007 Baker Hughes Company 28 DPI 610 615 IS Instruction Manual English Chapter 5 Advanced Task...
Страница 64: ...Copyright 2007 Baker Hughes Company 54 DPI 610 615 IS Instruction Manual English Chapter 8 Calibration...
Страница 75: ......