
INSTALLATION
PRE-OPERATING ADJUSTMENTS
I-E96-107-2N
3 - 13
5. After AC wiring is completed, check the placement of the
multibus modules. Compare module placement and check the
switch settings against the boards shown in
.
6. Connect the Plant Loop or INFI-NET Communication Link.
Refer to
Multibus Communication Loop Module
of this manual for further information (IIOIS12 only).
7. After completing the wiring, and checking the AC voltage
sources, apply power.
PRE-OPERATING ADJUSTMENTS
Each OIS/OIC is powered up and tested before shipment. All
necessary power supply adjustments, CRT adjustments and
jumper connections have been made. Install the OIS/OIC by
following these instructions.
•
Set it into place according to the
Site Preparation Man-
ual, I-E96-500
.
•
Connect the incoming AC, equipment ground.
•
Connect the communication highway connections to the
Network Interface Unit (NIU) (IIOIS12 only).
•
Check connections.
•
Check power supply voltages.
•
Check indicators.
•
Check system configuration.
•
Refer to the troubleshooting information in
correct any problems.