39
2" (5,1 cm)
PARTS REQUIRED
Secure lower edge of panel to floor frame with 2" nails spaced 6" apart.
Angle nail to hit floor frame
(Fig. A)
.
Secure wall bottom plates to floor with 3" nails
(Fig. A)
.
2
You have finished standing your front wall.
FINISH
3" (7,6 cm)
x18
3" (7,6 cm)
x2
x28
FRONT WALL
3" (7,6 cm) Nails
BEGIN
Center wall on the 168" (426,7 cm) floor dimension.
Use
OO
as a temporary brace. Secure with (2) 3" screws.
1
OO
x1
1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm)
3" (7,6 cm)
Screws
OO
168"
(426,7
cm)
DOOR
LOCATION
MAY VARY
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A
6"
(15,2 cm)
Temporary Support
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...