HINT:
For easier nailing
stand on frame.
23
FRONT WALL WITH DOOR LEFT
PARTS REQUIRED:
3" (7,6 cm)
x60
x2
2 x 4 x 80" (5,1 x 10,2 x 203,2 cm)
TK
SEAM
x2
2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm)
CPA
x2
2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm)
YFA
3
x1
2 x 4 x 35" (5,1 x 10,2 x 88,9 cm)
QT
60"
(152,4 cm)
83-1/4"
(211,5 cm)
108"
(274,3 cm)
108"
(274,3 cm)
120"
(337,2 cm)
132-3/4"
(304,8 cm)
12"
(30,5 cm)
32"
(81,3 cm)
QT
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Two nails at
each location.
YFA
TK
TK
Window Frame
Assemblies
Install QT first!
2
Place
Sub-Assembly
in frame as shown. Measure and mark.
Secure with (2) 3" nails at each mark and (4) 3" nails at seam.
Orient door frame parts on edge on floor as shown. Measure and mark.
Install QT first.
Secure with (2) 3" nails at each mark as shown.
Hold Seam
Flush
CPA
84-3/4"
(215,3 cm)
59-1/4"
(151,5 cm)
35-1/4"
(89,5 cm)
You have finished your front wall frame.
FINISH
x2
Window Frame Assembly
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...