50
1
BEGIN
x2
2 x 3 x 21-3/4" (5,1 x 7,6 x 55,2 cm)
AED
SHELVES
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x2
PT
PT
AED
58-1/2"
(148,6 cm)
40-1/2"
(102,9 cm)
3" (7,6 cm)
x4
3" (7,6 cm)
Screws
PARTS REQUIRED:
2
FLOOR
Secure each
AED
with (2) 3" screws t an angle at gable wall stud and 3" nails
into eave wall stud as shown.
Place loft support ledger boards
AED
between gable wall and eave wall stud with
narrow side to wall panel
(Fig. A)
.
Secure both
PT
with 3" nails as shown.
Measure and mark location for
AED (Fig. A, Fig. B)
.
Mark locatins for both
PT
shelf supports.
LEVEL
3" (7,6 cm)
Nails
58-1/2"
(148,6 cm)
40-1/2"
(102,9 cm)
3" (7,6 cm)
x10
Fig. A
Fig. B
3" (7,6 cm)
Nails
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...