79
Fig. D
x19
2" (5 cm)
PARTS REQUIRED:
DOOR TRIM
ZJ
DDA
Flush
ZJ
with bottom of wall panel and single
door
(Fig. D)
.
Ensure 3/8" gap between door and trim
(Fig. D)
.
Secure with 2" finish nails into framing,
as shown.
2
ZJ
x1
19/32 x 2-1/2 x 72" (3,2 x 6,3 x 182,9 cm)
x1
DDA
19/32 x 3-1/2 x 40" (1,5 x 8,9 x 101,6 cm)
3/8"
(1,0 cm)
CENTER
Flush
Flush
Flush
CENTER
CENTER
CENTER
x1
19/32 x 6-7/16 x 5-1/2" (1,5 x 17,5 x 14 cm)
NRA
x1
19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm)
JTA
NRA
JTA
BEGIN
1
Center trim
DDA
over door flush to
hinge board and
ZJ
.
Secure with 2" finish nails into framing,
as shown
(Fig. D)
.
2" (5,1 cm)
Finish Nails
into wall frame
2" (5,1 cm)
Finish Nails
into wall frame
FINISH
3
4
Locate
JTA
centered over door trim.
Secure with (1) 2" finish nail close to trim as shown
(Fig. E)
.
Place
NRA
centered over
JTA
.
Secure with (5) 2" finish nails as shown
(Fig. F)
.
Nail into
JTA
and framing at bottom.
You have finished installing your single door trim.
Fig. E
Fig. F
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...