59
PARTS REQUIRED:
GABLE TRIM
Flush
Flush
Flush
Flush
2" (7,6 cm)
Finish Nails
2" (7,6 cm)
Finish Nails
RIGHT FASCIA
FASCIA
LEFT FASCIA
x4
3/8 x 4-3/4 x 54-5/8" (1 x 12,1 x 138,7 cm)
x2
3/8 x 10 x 17"
(1 x 25,4 x 43,2 cm)
Keystone
Flush
Flush
18"
(46 cm)
Approximately
You have finished installing your gable fascia and keystone.
FINISH
BEGIN
1
Secure with 2" finish nails into gable unit in pattern shown.
Secure with 2" finish nails into gable unit and spaced evenly (approximately 18" (46 cm).
Secure with 2" finish nails into gable unit and spaced evenly (approximately 18" (20,3 cm).
Repeat
Steps 1 - 3
for opposite side.
Line up (10" x 17")
Keystone
flush to gable unit peak and flush with roof sheathing
(Fig. A)
.
Place fascia
4-3/4" x 54-5/8"
flush to
Keystone
and flush with roof sheathing
(Fig. B)
.
Place
LEFT fascia
flush to
Keystone
and flush with roof sheathing
(Fig. B)
.
2
3
2" (5,1 cm)
Finish Nail
Flush
Fig. B
End
View
x48
2" (5,1 cm)
Fig. A
Flush
Flush
Keystone
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...