41
PARTS REQUIRED:
3" (7,6 cm)
x1
BACK WALL
2" (5,1 cm)
x2
x14
1-1/2" (3,8 cm)
Fig. A
Flush
STEP
3
FIRST
SCREW
BEGIN
Center back wall on the 168" (426,7 cm) floor dimension.
Secure top of wall with (1) 2" screw into top plate
(Fig A)
.
1
Nail gable wall panel to back wall stud with
1-1/2" nails spaced 6" apart
(Fig. B)
.
ENSURE GABLE AND BACK WALL PANELS
ARE FLUSH BEFORE SECURING.
6" (15,2 cm)
Fig. B
1-1/2"
(3,8 cm)
Nails
Fig. C
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
BE SURE TOP OF WALL FRAMES ARE FLUSH.
2"
(7,6 cm)
Screw
2" (5,1 cm)
Screw
2
Move to the bottom of gable end wall and
secure bottom of wall with (1) 2" screw into
back wall bottom plate
(Fig A)
.
Flush
Secure gable wall top frame 2 x 4 with (1) 3" screw
driven into back wall frame at an angle as shown,
(Fig. C)
.
STEP
4
SECOND
SCREW
168"
(426,7
cm)
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...