64
4
PARTS REQUIRED:
DOUBLE DOORS - GABLE WALL
OO
Flush
against wall panels.
Fig. A
OO
Center doors on panel seam as shown
(Fig. B)
.
Remove temporary supports and check doors open properly.
FINISH
You have finished installing your double doors.
Screw hinge boards into wall supports and floor with (10) 3" screws as shown.
Make sure screws go into framing and foor
(Fig. C, D)
.
5
3" (7,6 cm)
Screws into the wall
support and foor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Install temporary support
OO
as a ledger board flush under wall
panels for doors to rest on. Secure with (2) 3" screws
(Fig. A)
.
3" (7,6 cm)
x12
OO
x1
69" (175,3 cm) Door Stiffener
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...