60
PARTS REQUIRED:
EAVE SIDE SOFFITS
Ensure soffit boards are fush at rafter ends (Fig. B) and fush at seam
.
x36
2" (5,1 cm)
1
BEGIN
x2
3/8 x 4-7/8 x 73-1/2" (1 x 12,4 x 186,7 cm)
x2
3/8 x 4-7/8 x 96" (1 x 12,4 x 243,8 cm)
Flush
x2
2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm)
AO
Place eave nailer
AO
between two center rafters as shown.
Keep
AO
flush to the outside edge of rafter
(Fig. A, Fig. B)
.
Pre-drill
a 1/8" hole through center rafters into
AO
to avoid splitting rafter. Secure with 3" screws
(Fig. A)
.
AO
AO
Fig. A
PRE-DRILL
Flush
Flush
(2) 3" (7,6 cm) Screws
(2) 3" (7,6 cm) Screws
3" (7,6 cm)
x4
Содержание Yardline 16574-SB
Страница 2: ...This page intentionally left blank...